ad_fmclidar1_ebz/README: Add Known Issues section

Add  description of the power-up issue and its solution.
main
István Csomortáni 2019-12-18 16:59:47 +02:00
parent d4b3a3f640
commit 8db77d8f3a
1 changed files with 14 additions and 0 deletions

View File

@ -114,6 +114,20 @@ parameter and attributes.
| GT reference clock | 250MHz |
| Device clock | 250 MHz |
## Known issues
### The Lidar boards do not power up
**Problem:** The Lidar boards do not power up because the PG_C2M pull-up resistor value on the carrier (Arria 10) is too high.
**Solution:** On Arria 10 - place a 4k7 ohms resistor in parallel with R5517.
**Note:**
1. The PG_C2M can no longer be software controlled. As soon as there is an auxiliary 3V3 on the carrier, the Lidar platform receives the power up command.
2. This problem only affects Lidar Rev B.
## References
+ AD-FMCLIDAR1-EBZ product page: https://www.analog.com/en/design-center/evaluation-hardware-and-software/evaluation-boards-kits/AD-FMCLIDAR1-EBZ.html