ad_fmclidar1_ebz/README: Add Known Issues section
Add description of the power-up issue and its solution.main
parent
d4b3a3f640
commit
8db77d8f3a
|
@ -114,6 +114,20 @@ parameter and attributes.
|
||||||
| GT reference clock | 250MHz |
|
| GT reference clock | 250MHz |
|
||||||
| Device clock | 250 MHz |
|
| Device clock | 250 MHz |
|
||||||
|
|
||||||
|
## Known issues
|
||||||
|
|
||||||
|
### The Lidar boards do not power up
|
||||||
|
|
||||||
|
**Problem:** The Lidar boards do not power up because the PG_C2M pull-up resistor value on the carrier (Arria 10) is too high.
|
||||||
|
|
||||||
|
**Solution:** On Arria 10 - place a 4k7 ohms resistor in parallel with R5517.
|
||||||
|
|
||||||
|
**Note:**
|
||||||
|
|
||||||
|
1. The PG_C2M can no longer be software controlled. As soon as there is an auxiliary 3V3 on the carrier, the Lidar platform receives the power up command.
|
||||||
|
2. This problem only affects Lidar Rev B.
|
||||||
|
|
||||||
|
|
||||||
## References
|
## References
|
||||||
|
|
||||||
+ AD-FMCLIDAR1-EBZ product page: https://www.analog.com/en/design-center/evaluation-hardware-and-software/evaluation-boards-kits/AD-FMCLIDAR1-EBZ.html
|
+ AD-FMCLIDAR1-EBZ product page: https://www.analog.com/en/design-center/evaluation-hardware-and-software/evaluation-boards-kits/AD-FMCLIDAR1-EBZ.html
|
||||||
|
|
Loading…
Reference in New Issue